ENERGO-PRO expanded its operations to Galicia (Spain) in 2023 when the group completed the acquisition of 100% of the share capital in Xallas Electricidad y Aleaciones S.A.U.(„Xeal“) and Feroe Ventures & Investments S.L.U.(„Feroe“).

Xeal operates ten hydropower plants with a total capacity of 167 MW and two ferroalloy plants. Feroe has applied for the grant of a concession for a new pumped-storage plant with a planned capacity of 400 MW.

Galicia, in the north-western part of Spain, is the rainiest region of the country. With an annual rainfall of more than 2,100 litres per square metre, it offers favourable conditions for operating hydropower plants. Thanks to the four dams and the cascade system, it is possible to to perfectly exploit the potential of the Xallas River, to optimize revenue and power generation according to the needs of the transmission system, and to offer support services, the need for which grows with a larger share of variable renewables in the grid.

According to the relevant concession agreement, all the power plants on the Xallas River will remain in operation until at least 2060.

Market entry

2023

Assets

10 hydropower plants

Number of employees

249

Installed capacity

167 MW

Annual generation

408 GWh

Carantoña HPP

History

The HPP was put into operation in 1961, and it has been part of ENERGO-PRO since 2023. The concession is valid until 2060. The HPP is fitted with two Francis turbines.

Type of power plant

Hydropower, run-of-the-river, located on the Grande River

Installed capacity

5 MW

Annual electricity production

20.3 GWh

Fervenza I HPP

History

The HPP was put into operation in 1995, and it has been part of ENERGO-PRO since 2023. The concession is valid until 2060. The HPP is fitted with one Francis turbine.

Type of power plant

Hydropower, located below the Fervenza Dam on the Xallas River

Installed capacity

3.6 MW

Annual electricity production

8.1 GWh

Fervenza II HPP

History

The HPP was put into operation in 1995, and it has been part of ENERGO-PRO since 2023. The concession is valid until 2060. The HPP is fitted with three Kaplan turbines.

Type of power plant

Hydropower, located below the Fervenza Dam on the Xallas River

Installed capacity

6.3 MW

Annual electricity production

17.7 GWh

Ponte Olveira I HPP

History

The HPP was put into operation in 1969, and it has been part of ENERGO-PRO since 2023. The concession is valid until 2060. The HPP is fitted with two Kaplan turbines.

Type of power plant

Hydropower, located below the Ponte Olveira Dam on the Xallas River

Installed capacity

2.7 MW

Annual electricity production

5.2 GWh

Ponte Olveira II HPP

History

The HPP was put into operation in 2018, and it has been part of ENERGO-PRO since 2023. The concession is valid until 2060. The HPP is fitted with three Kaplan turbines.

Type of power plant

Hydropower, located below the Ponte Olveira Dam on the Xallas River

Installed capacity

6.3 MW

Annual electricity production

17.3 GWh

Novo Castrelo HPP

History

The HPP was put into operation in 2018, and it has been part of ENERGO-PRO since 2023. The concession is valid until 2060. The HPP is fitted with three Kaplan turbines.

Type of power plant

Hydropower, located below the Ponte Oliviera Dam on the Xallas River

Installed capacity

6.1 MW

Annual electricity production

19.8 GWh

Santa Uxía I HPP

History

The HPP was put into operation in 1990, and it has been part of ENERGO-PRO since 2023. The concession is valid until 2060. The HPP is fitted with one Francis turbine.

Type of power plant

Hydropower, located below the Santa Uxía Dam on the Xallas River, near the mouth of the river to the ocean

Installed capacity

49.1 MW

Annual electricity production

157.9 GWh

Santa Uxía II HPP

History

The HPP was put into operation in 1990, and it has been part of ENERGO-PRO since 2023. The concession is valid until 2060. The HPP is fitted with one Francis turbine.

Type of power plant

Hydropower, located below the Santa Uxia Dam on the Xallas River, near the mouth of the river to the ocean

Installed capacity

49.1 MW

Annual electricity production

158.9 GWh

Castrelo HPP

History

The HPP was put into operation in 1957, and it has been part of ENERGO-PRO since 2023. The concession is valid until 2060. The HPP is fitted with three Francis turbines.

Type of power plant

Hydropower, located below the Santa Uxia Dam on the Xallas River, near the mouth of the river to the ocean

Installed capacity

28.7 MW

Annual electricity production

28.2 GWh

Novo Pindo HPP

History

The HPP was put into operation in 2004, and it has been part of ENERGO-PRO since 2023. The concession is valid until 2060. The HPP is fitted with one Francis turbine.

Type of power plant

Hydropower, located below the Santa Uxia Dam on the Xallas River, near the mouth of the river to the ocean

Installed capacity

9.8 MW

Annual electricity production

28.6 GWh

Company

Xallas Electricidad y Aleaciones S.A.U.


Address