Georgia

Georgia

ENERGO-PRO Georgia Holding JSC

ENERGO-PRO Georgia Holding JSC was established by ENERGO - PRO a.s. on 15 April 2021 to provide management and shared services to ENERGO-PRO Georgia JSC, EP Georgia Generation JSC and EP Georgia Supply JSC. ENERGO-PRO Georgia Holding JSC owns 100% of shares in ENERGO-PRO Georgia JSC, EP Georgia Generation JSC and EP Georgia Supply JSC.

ENERGO-PRO Georgia JSC

ENERGO-PRO Georgia JSC is the largest energy distribution company in Georgia in terms of the number of customers served and its sales and services territory, according to management estimates. ENERGO-PRO Georgia JSC operates and maintains an electricity distribution network in Georgia, which extended to 52,955 km as of 31 December 2023 and its license area covers approximately 85% of Georgia’s territory.

Visit the website www.energo-pro.ge

EP Georgia Supply JSC

EP Georgia Supply JSC was established in May 2021 to carry out supply activities as a result of the legal unbundling of distribution and supply activities of ENERGO-PRO Georgia JSC.

EP Georgia Generation JSC

EP Georgia Generation JSC owns and operates 15 medium sized HPPs with a total capacity of 491 MW.

Visit the website www.epggen.ge/en

LLC gPower

LLC gPower, held by EP Georgia Generation JSC, owns and operates the Gardabani gas-fired thermal power plant with installed capacity of 110 MW, which provides guaranteed reserve capacity to ensure stability, security and reliability of Georgia’s unified electricity system.

Market entry

2006

Assets

15 hydropower plants

Number of employees

6,297

Installed capacity

601 MW

Annual generation

1,720 GWh

Number of grid customers

more than 1,300,000

Distribution network length

52,955 km

Amount of electricity supply annually

3.9 GWh

Chkhorotsku HPP

History

The HPP was put into operation in 1967, and it has been part of ENERGO-PRO since 2009.

Type of power plant

Run-of-the-river

Installed capacity

6 MW

Annual electricity production

19 GWh

Gumati Cascade - Gumati I HPP

History

The HPP was put into operation in 1958, and it has been part of ENERGO-PRO since 2007. The HPP is located on the Rioni River.

Type of power plant

Dam

Installed capacity

48.4 MW

Annual electricity production

n/a

Gumati Cascade - Gumati II HPP

History

The HPP was put into operation in 1958, and it has been part of ENERGO-PRO since 2007. The HPP is located on the Rioni River.

Type of power plant

Run-of-the-river

Installed capacity

22.8 MW

Annual electricity production

326 GWh

Shaori-Tkibuli Cascade – Shaori HPP

History

The HPP was put into operation in 1955-1956, and it has been part of ENERGO-PRO since 2007. The HPP is located on the Didichala River.

Type of power plant

Dam

Installed capacity

40.3 MW

Annual electricity production

156 GWh

Shaori-Tkibuli Cascade – Dzevrula HPP

History

The HPP was put into operation in 1955-1956, and it has been part of ENERGO-PRO since 2007. The HPP is located on the Tkibula River.

Type of power plant

Dam, combined watercourse created by diverting used water from the HPP Shaori into the Tkibula River

Installed capacity

80 MW

Annual electricity production

146 GWh

Rioni HPP

History

The HPP was put into operation in 1933, and it has been part of ENERGO-PRO since 2007. The HPP is built on the common watercourse of the rivers Rioni and Tskhenistskali.

Type of power plant

Run-of-the-river, derivative

Installed capacity

54 MW

Annual electricity production

272 GWh

Lajanuri HPP

History

The HPP was put into operation in 1960, and it has been part of ENERGO-PRO since 2007. The HPP is built on a watercourse created by the diversion of the Tskhenistskali River into the Lajanuri River.

Type of power plant

Dam

Installed capacity

115.6 MW

Annual electricity production

394 GWh

Kinkisha HPP

History

The HPP has been part of ENERGO-PRO since 2009. It is located near the village of Kvirike in Adjara Region.

Type of power plant

Run-of-the-river

Installed capacity

0.9 MW

Annual electricity production

2 GWh

Atsi HPP

History

The HPP was put into operation in 1941, and it has been part of ENERGO-PRO since 2007. It is located on the Acharistskali River.

Type of power plant

Run-of-the-river

Installed capacity

18.4 MW

Annual electricity production

99 GWh

Chitakhevi HPP

History

The HPP was put into operation in 1949-1951, and it has been part of ENERGO-PRO since 2008. It is located on the Mtkvari River.

Type of power plant

Run-of-the-river

Installed capacity

21 MW

Annual electricity production

105 GWh

Zahesi HPP

History

The construction of the HPP began in 1923, and it was put into operation in 1927. The HPP has been part of ENERGO-PRO since 2009. It is the oldest hydropower plant in the company’s portfolio.

Type of power plant

Dam, derivative

Installed capacity

38.6 MW

Annual electricity production

208 GWh

Sioni HPP

History

The HPP was put into operation in 1964, and it has been part of ENERGO-PRO since 2009. It is located near the village of Sioni in the Kverno Kartli Region.

Type of power plant

Dam

Installed capacity

9 MW

Annual electricity production

12 GWh

Satskhenisi HPP

History

The HPP was put into operation in 1952, and it has been part of ENERGO-PRO since 2007. It is located in the village of Saakadze.

Type of power plant

Run-of-the-river

Installed capacity

14 MW

Annual electricity production

5 GWh

Ortachala HPP

History

The HPP was put into operation in 1953, and it has been part of ENERGO-PRO since 2008. It is located on the Mtkvari River.

Type of power plant

Run-of-the-river, fully automated with tidal regulation

Installed capacity

18 MW

Annual electricity production

74 GWh

Martkopi HPP

History

The HPP was put into operation in 1952, and it has been part of ENERGO-PRO since 2009.

Type of power plant

Run-of-the-river, fully automated with tidal regulation

Installed capacity

3.9 MW

Annual electricity production

1 GWh

gPower gas-fired power plant

History

The power plant was built in 2005 as the first successful project using the latest power plant technology in Georgia, and it has been part of the ENERGO PRO since December 2010. The power plant is located in Gardabani in the vicinity of the premises of the Tbilsresi gas power plant operator.

Type of power plant

Gas turbine power plant (GTPP)

Installed capacity

110 MW

ENERGO-PRO Georgia JSC

History

ENERGO-PRO Georgia JSC is the largest energy distribution company in Georgia in terms of the number of customers served and its sales and services territory, according to management estimates. ENERGO-PRO Georgia JSC operates and maintains an electricity distribution network in Georgia, which extended to 52,955 km as of 31 December 2023 and its license area covers approximately 85% of Georgia’s territory.

Network length

52,955 km

Number of grid customers

1.3 million

Company

ENERGO-PRO GEORGIA HOLDING JSC


Address

24 Zurab Anjaparidze Str.0186 Tbilisi, Georgia