Litoměřice HPP

The company started constructing the hydropower plant in 2010 and it was put into operation in December 2012. The hydropower plant is located on the right bank of the Elbe River. The plant is fitted with two low-head Kaplan turbines.
Type of power plant

Weir, run-of-the-river, low-pressure

Installed capacity

7.2 MW

Annual electricity production

28 GWH