This three-step cascade is located on the Kelkit River. One of the three hydropower plants, the furthest one upstream, is located in the vicinity of Sivas City. The other two are near the town of Tokat.
Water for the cascade is supplied from the Kilicka Reservoir. Its total installed capacity is 65.60 MW. The individual power plants were put into operation between 2009 – 2010, and the whole cascade was acquired by ENERGO-PRO in 2010.